We handled the crane at the port which was used to construct the container position. The challenge of this project was the system and the hardware device must be resistant / outdoor conditions robust (resistant to vibration and dynamic temperature changes), a safety system gripper if at any time of power failure, commissioning with limited time. Request for this project was to build a control system using PLC and HMI Mobile Mobile.

