Container Crane At Port Project

We handled the crane at the port which was used to construct the container position. The challenge of this project was the system and the hardware device must be resistant / outdoor conditions robust (resistant to vibration and dynamic temperature changes), a safety system gripper if at any time of power failure, commissioning with limited time. Request for this project was to build a control system using PLC and HMI Mobile Mobile.

Create your account